COMPLETED PROJECTS



“Socar Petroleum” CJSC — 2nd Oil Depot, Shirvan city, M. Fuzuli street, 4

Construction and installation works on access railway tracks (March–July).

  • Replacement of water pipelines passing under the railway track.
  • Construction, installation, and finishing works in the overpass area.
  • Construction of a retaining.


“Socar Petroleum” CJSC — 11th Oil Depot, Lankaran

Comprehensive repair and restoration works.

  • Installation of culvert pipelines under the railway track.
  • Installation of railway signaling signs for train traffic.
  • Additional works on access railway tracks.
  • Asphalt paving of railway crossings at intersections with roads and installation of guard rails.
  • Transportation of dismantled railway materials to the 11th Oil Depot warehouse area.


“Socar Petroleum” CJSC — 7th Oil Depot, Gazakh region, Khanlyglar village

Repair and installation of access railway lines.

  • Delivery of dismantled materials from the active line to the territory of the 7th Oil Depot.
  • Replacement of railway switches.
  • Additional works on access railway tracks.
  • Replacement of existing railway line and construction of new track.


“Socar Petroleum” CJSC — 6th Oil Depot, Ganja city, Kapaz district, “Gəc Zavodu” area

Construction and installation works at the wagon unloading section.

  • Installation of reinforced-concrete foundation for a metal overpass.
  • Fabrication, painting (double-layer alkyd paint), and installation of the metal overpass.
  • Construction of a retaining wall.
  • Transportation of dismantled railway materials to the territory of the 7th Oil Depot.
  • Replacement of railway switches.
  • Additional works on access railway tracks.
  • Replacement of existing railway line and construction of new line.


Local Executive Authority — Jalilabad district, City Administrative Department

Repair and construction works in the residential sector.

  • Construction and repair works in individual residential houses and auxiliary buildings located in Uzuntepe, Gazimabad villages and Mahmudchala residential area.
  • Works carried out in facilities located near the Baku–Astara highway.
  • Projects completed in accordance with the decree dated October 09, 2024.


Behremtepe Hydrological Junction, Araz River

  • Elimination of emergency condition of the hydro junction.
  • Fabrication of inlet and bottom spillway gates.
  • Fabrication of inlet gates of the Main Mughan Canal.
  • Fabrication of inlet gates of the new Southern Mughan Canal.
  • Fabrication of outlet gates of the Resularh Canal.
  • Fabrication of water and silt discharge gates at the spillway inlet section.
  • Restoration and repair of existing gates.
  • Repair of main lower spillway gates of the hydro junction.